As of September 30, 2002

Physical Progress

Contractor

JV of ABB, Kinden and Vinaincon

Commencement of the Works

21 December 2001

Time Elapsed (days) 250 of 540 (46.3%)

Progress

 
110/22 kV Substation Foundation works is under construction. Power transformers already manufactured and tested.
110 kV Transmission Line Survey finished. Design for tower & foundation is on progress.

 

Photographs

Reinforcement Steel Installation for 110kV GIS Foundation
POuring concrete for Generator foundation
Unit Masonry installation for 110/22kV S/S OCC Building
Top view of 110/222kV Substation Operation and Control Center Building

Top

Construction Supervision

The National holiday at the beginning of the month was respected as a day of rest for the staff and very bad weather at the end of the month inhibited construction work for some days. However, despite the inhibitions, physical progress has been good. Backfill to under side of ground beam to level at approx -0.07m has been achieved for 75% of the works.

Brickwork to foundation walls, external and internal, has been completed during the month. The substantial concrete bases to Generators one and two were concreted into place on 16th September and the larger GIS base was completed on Friday 20th September 2002. The steelwork for the transformer bases 1 and 2 was completed in preparation for concreting in early October.

At all stages of the months operations the earthing system has been connected and jointed as appropriate to steel reinforcing, built into structural brickwork and laid across backfill as required. Minor changes to the cabling trenches were approved and implemented. Lean concrete has been laid to the base of the cable trenches.

The final detail design for 110kV Transmission Line Tower in accordance with Engineer’s instruction and Foundation was completed and Drawings and Calculations were submitted by 11th September 2002.

Detailed design of other electrical and mechanical systems continues.

Activities for Coming Months

Permanent Works

Cable trenches to be completed.

Transformer foundation bases No’s 1& 2 to be completed.

Continue earth grid work

Complete backfiling to foundations of sub-station.

Formwork, R/F steel and concrete to ground floor slab

Formwork, R/F steel and concrete columns from ground floor to first floor

Formwork and R/F steel for beams and slab to first floor

Formwork and R/F steel to external stairs

Top


This homepage is presented by the Consultant Team

Any further question should be forwarded to Webmaster or Consultant Team

 

 


Progress To Date

By Figure
By Primavera



Tunnel Excavation
Record

By Number
By Figure
By Plan
By Chart




Monthly Progress

Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII



News and Events
Project
Public Media
Visitor List



Organization Charts

The Employer
The Consultant
The Contractors
Others



Consultant Office

List of Staff
Members Only



Project Information
Introduction
(MS-PowerPoint)
Project Map
Background
Major Features
Chronicle
Contract Packages
Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII
Natural Conditions
Socio-Economic Dev.



Public Relations
Site Map
Contact Us
Related Agencies
Link
FAQs
Knowledgebase
Guest Book



Our Gallery
Computer Graphics
Perspective
Vietnam
Introduction
Photo Selection



Around Project
Highway Network in
Vietnam
Large-scaledHighway
Projects in Central
of Vietnam



Tiếng Việt



Coordination