Project Information > Contract Packages

Package III - Electrical Works

Executing Agency
Ministry of Transport and Communication
Employer
Project Management Unit 85 (PMU 85)
Loans Under
JBIC-Japan Bank for International Cooperation
Consultant

Joint Ventuve of NIPPON KOEI CO., LTD. (Japan) and LOUIS BERGER INC. (USA) in association with TEDI (Vietnam)

Contractor

Package Data

Scope of Works

The Scope of Works listed below is for the construction of the Hai Van Pass Tunnel Electrical and Control Systems in the framework of the Hai Van Pass Tunnel Construction Project is intended to give the description of the Works required.

1. Electrical Systems

1.1 Medium Voltage System

  • MV/LV Substations

The MV System makes provision for the construction of 8 (eight) MV/LV substations, to provide power supply to the tunnel electrical consumers.

All substations are designed with the single busbar configuration and shall be equipped with 2 (two) Distribution Transformers (excluding substations S/S-7 and S/S-8, which shall be of the compact type with only 1 (one) Distribution Transformer).

Substations S/S-1, S/S-2, S/S-4, and S/S-6 shall contain 4 (four) 24 kV rated Circuit Breakers for MV lines and Distribution Transformers protection, when substations S/S-3 and S/S-5 shall hold 6 (six) of the same type Circuit Breakers.

The compact substations S/S-7 and S/S-8 shall be equipped with 24 kV rated RMU’s (Ring Main Units) providing Circuit Breakers’ protection to the Distribution Transformers with motorised Load Break Switches on outgoing lines.

  • MV Power Distribution Lines

The MV Power Distribution lines shall be installed in the dedicated raceways inside the tunnel and in the ductbanks or directly buried in the ground outside the tunnel facility.

Configuration of the MV Power Distribution System shall made provision to be operated with "open" or "closed" loop system’s philosophy.

The MV Power Distribution line conductor inside the tunnel and in the ductbanks installation shall be a single core unarmed XLPE insulated Cu PVC sheeted 24 kV rated cable.

1.2 Low Voltage System
  • Low Voltage Switchboards

The following Low Voltage Switchboards shall be installed in the separate compartment for each MV/LV substation:

* Main LV Distribution Board

* Auxiliary Distribution Boards (AC and DC)

* Interior and Exterior Lighting Distribution Boards (in substations supplying power to these facilities, including Main 110/22 kV Substation)

  • LV Power Distribution Lines

The LV Power Distribution lines shall be installed in the dedicated raceways inside the tunnel and in the ductbanks or directly buried in the ground outside the tunnel facility.

The System makes provision for utilisation of the mineral insulated (MgO) fire resistant cables as conductors inside the tunnel. The NYY type single or multi-core cables shall be installed in ductbanks outside the tunnel. The NYBY type multi-core cables shall be used where direct burial in the ground installation method has been applied

LV Power Distribution System shall be of the 5 (five) wires system PEN configuration with a separate Earth Continuity Conductor.

2. Lighting system

  • Interior Tunnel Lighting System

The Interior Tunnel Lighting System divided for four Interior Lighting Zones at each tunnel entrance (Threshold zone, Transition zone 1, Transition zone 2 and Transition zone 3) with one common Interior zone.

All Interior Tunnel Lighting shall be supported by UPS System to prevent the tunnel blackout during failure or malfunction of the power supply.

  • Exterior (Road and Area) Lighting System

Construction of the Exterior (Road and Area) Lighting System would require close co-operation and co-ordination between various contractors. These activities are the Contractor’s obligation and responsibility.

3. CCTV System

4. Lighting Control System

5. Fire Alarm and Detection System

6. Telecom System

7. Traffic Control System

8. Radio Rebroadcast System

9. Tunnel Power Distribution Monitoring and Control System

10. Main Supervised Control and Data Acquisition (SCADA) System

  • Contractor's Organization Chart
  • Overall Construction Work Schedule

This homepage is presented by the Consultant Team

Any further question should be forwarded to Webmaster or Consultant Team
 


Progress To Date

By Figure
By Primavera



Tunnel Excavation
Record

By Number
By Figure
By Plan
By Chart




Monthly Progress

Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII



News and Events
Project
Public Media
Visitor List



Organization Charts

The Employer
The Consultant
The Contractors
Others



Consultant Office

List of Staff
Members Only



Project Information
Introduction
(MS-PowerPoint)
Project Map
Background
Major Features
Chronicle
Contract Packages
Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII
Natural Conditions
Socio-Economic Dev.



Public Relations
Site Map
Contact Us
Related Agencies
Link
FAQs
Knowledgebase
Guest Book



Our Gallery
Computer Graphics
Perspective
Vietnam
Introduction
Photo Selection



Around Project
Highway Network in
Vietnam
Large-scaledHighway
Projects in Central
of Vietnam



Tiếng Việt



Coordination