Package V : 110/22KV Substation and 110KV Transmission

Executing Agency Ministry of Transport and Communication
Employer Project Management Unit 85 (PMU 85)
Loans Under JBIC-Japan Bank for International Cooperation
Consultant NIPPON KOEI CO., LTD. (Japan)

LOUIS BERGER INC. (USA)

TEDI (Vietnam)

Contractor Joint Corporation of ABB, Kinden (Japan) and VINAINCO (Vietnam)

 

Package Data

  • Scope of Work

he Scope of Works listed below is for the construction of the 110/22 kV GIS (Gas Insulated Switchgear) Substation/Operation Control Centre for the Hai Van Pass Tunnel and 110 kV Transmission Line in the framework of the Hai Van Pass Tunnel Construction Project is intended to give the description of the Works required.

1. 110/22 KV GIS SUBSTATION/OPERATION CONTROL CENTRE AND ASSOCIATED FACILITIES

2. ELECTRICAL AND CONTROL SYSTEMS

2.1 HIGH VOLTAGE SYSTEM

* Single busbar configuration 123 kV rated indoor GIS type switchgear with:
* Two (2) line bays
* Two (2) power transformer bays
* One (1) bus coupler
* Equipped with circuit breakers, disconnectors, earthing switches, instrument transformers, connectors, hardware, etc.
* Two (2) power transformers 110/22 kV, 10 MVA rated, with on-load tap-changer

2.2 MEDIUM VOLTAGE SYSTEM

* Single busbar configuration metalclad 24 kV rated indoor GIS type switchgear with:
* Two (2) incoming bays
* Two (2) distribution transformer bays
* One (1) bus coupler bay
* Four (4) outgoing feeder bays
* Equipped with disconnectors, earthing switches, instrument transformers, protection relays, digital power analysers, etc.
* Two (2) distribution transformers 22/0.416-0.240 kV, 1600 kVA, Dyn 11

2.3 LOW VOLTAGE SYSTEM

* Main LV Distribution Board
* Auxiliary Distribution Boards (AC and DC)
* Batteries and Batteries Charger
* Interior and Exterior Lighting and Small Power Systems

2.4 STANDBY POWER SUPPLY SYSTEM

* Two (2) Diesel Generator sets 1000 kW each
* Two (2) fuel supply systems with 1 (one) day capacity fuel storage tanks 

2.5 SUBSTATION EARTHING AND LIGHTNING PROTECTION SYSTEMS

Complete 110/22 kV GIS Substation/Operation Control Centre Primary and Secondary Earthing and Lightning Protection Systems.

2.6. TELECOM SYSTEM

Complete Telecom System for 110/22 kV GIS Substation/Operation Control Centre successful operation.

2.7. ACCESS CONTROL SYSTEM

Complete Access Control System for 110/22 kV GIS Substation/Operation Control Centre successful operation.

2.8. RACEWAY NETWORK FOR SCADA SYSTEMS

Complete Raceway Network for various tunnel SCADA systems' cabling to the Control Room, Operators' and/or Engineer' premises (Tunnel Power Monitoring and Control, Tunnel Ventilation Control, Tunnel Traffic Control, Fire Alarm and Detection, CCTV Surveillance, Public Address and Radio Rebroadcast, Tunnel SOS Telephone, etc.). The Raceway Network shall accommodate all required cabling (including Substation/Control Centre own) with allowances up to 100% expansion.

3. 110 KV POWER TRANSMISSION LINE

The 110 kV Power Transmission Line shall be constructed from two sections:
* 110 kV Overhead Line
* 110 kV Underground Line

3.1. 110 KV OVERHEAD LINE CONDUCTORS AND ACCESSORIES

The current-carrying conductor shall consist of ťaluminium strands reinforced with a core of galvanised steel wires (ACSR), the earthing wire shall be stranded galvanised steel wire (GSW). 

3.3. UNDERGROUND 110 KV TRANSMISSION LINE

Approx. 300 m from the 110 kV Substation/Operation Control Centre the Overhead Transmission Line shall be transferred to the Underground Transmission Line.
This transfer shall take place on the dedicated yard located by the Contractor and suitable for the installation of the related equipment required for such transfer.
From this point the Contractor shall design and construct underground ductbank with associated manholes for installation of the Underground Transmission Line.
The Underground Transmission line shall be executed by 123 kV rated XLPE insulated power cables as stated in the Detailed Technical Specification and shown on the related drawings and diagrams. 

This homepage is presented by the Consultant Team

Any further question should be forwarded to Webmaster or Consultant Team

 

 


Progress To Date

By Figure
By Primavera



Tunnel Excavation
Record

By Number
By Figure
By Plan
By Chart




Monthly Progress

Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII



News and Events
Project
Public Media
Visitor List



Organization Charts

The Employer
The Consultant
The Contractors
Others



Consultant Office

List of Staff
Members Only



Project Information
Introduction
(MS-PowerPoint)
Project Map
Background
Major Features
Chronicle
Contract Packages
Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII
Natural Conditions
Socio-Economic Dev.



Public Relations
Site Map
Contact Us
Related Agencies
Link
FAQs
Knowledgebase
Guest Book



Our Gallery
Computer Graphics
Perspective
Vietnam
Introduction
Photo Selection



Around Project
Highway Network in
Vietnam
Large-scaledHighway
Projects in Central
of Vietnam



Tiếng Việt



Coordination