Progress Report > Package III - Electrical Works
Summary from Contractor The month of May was a period of detailed and extensive testing of PKIII systems. Substations No 8 was energised in the first week of May. All other substations had been energised between late February and late April. With some exceptions, all installation work was completed in mid May and testing and commissioning of systems completed in last days of the month. This included the MV/LV power, lighting control, CCTV; telecommunication, fire alarm and detection, and traffic control systems. The major exception was the radio rebroadcast (RRB) system. Factory acceptance testing was done in early May and equipment panels for OCC and substation locations delivered to site at end of May.On site training began in April with HAMADECO staff assigned to accompany PKIII trainers during field final installations and checking. Classroom training began in late April and is scheduled to be completed on 8 June. Combined Emergency Response training took place in May with HAMADECO, PKIII, PKIV, the Engineer’s ER Training Specialist and the participation of local fire and traffic police agencies Physical Progress in this month Completion of small power and lighting installations in north and south toll plazas (NTP & STP) Completion of power, telephone and fire alarm installations in VMB Completion of fire alarm installations in VAB, NTP, and STP Completion of lighting control sensors inside and outside tunnel Completion of installation of the radio rebroadcast leaky coaxial antenna in the tunnel continued with installation of matching amplifiers and cable termination in the tunnel roof area plus coaxial feeder cable to substations. Completion of back filling of cable trench along south roadBegin small rectification works (PKIII internal snag list) This homepage is presented by the Consultant Team Any further question should be forwarded to Webmaster or Consultant Team
|
|
||||||||||||||