Progress Report > Package IV - Mechanical Works
During the reporting period, the Contractor prepared the construction works as follows: - Study a modification on the water supply and water treatment system. - Prepare for the next coordination meeting with PKIA, PKIB and PK5 - Prepare and studying the coordination matters to be discussed with a PK3 contractor - Make shop drawings for the ventilation equipment. - Negotiate the conditions and technical specification with sub-contractors. - Prepare the mobilization and site establishment.