As of July 31, 2002

Physical Progress

Contractor

JV of ABB, Kinden and Vinaincon

Commencement of the Works

21 December 2001

Time Elapsed (days) 190 of 540 (35.19%)

Progress

 
110/22 kV Substation Foundation works is under construction. Power transformers already manufactured and tested.
110 kV Transmission Line Survey finished. Design for tower & foundation is on progress.

 

Photographs

Lean Concrete Work for 110/22kV OCC Building Foundation
Reinforcing Steel Work for 110/22kV Substation OCC Building Foundation

 

Top

Construction Supervision

The report of 110kV overhead transmission line geological survey has been completed. The design for tower and foundation of overhead transmission line is under preparation.

Two power transformers 110/22kV 10KVA were manufactured and successfully routine factory tested on July 15 and 16, 2002.

The technical documents and quotation for connecting plan of 110/22kV substation to EVN power network has been submitted.

The design of substation and tunnel control building has been completed and the construction of building foundation pillars is proceeding.

The co-ordination meeting with Contractor of Package V were held from July 29 to August 3, 2002.

Physical Progress in this month

- Final setting out of pillar foundations

- Lean concrete for foundation pillars

- Concrete mix design for class C concrete

- Reinforced steel bars tested and witnessed by the Engineer

- Rebar cages fabricated

- 2x20 MVA Power transformer manufacturing complete and routine factory tested.

Activities for Coming Months

Permanent Works

- Finalize the foundation pillars

- Install the deep earth electrodes and pillar riser electrodes.

- Backfill the foundation base to the level for base of cable trenches.

- Installation of sub-foundation earthing grid.

Previous month / Next month

Top


This homepage is presented by the Consultant Team

Any further question should be forwarded to Webmaster or Consultant Team

 

 


Progress To Date

By Figure
By Primavera



Tunnel Excavation
Record

By Number
By Figure
By Plan
By Chart




Monthly Progress

Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII



News and Events
Project
Public Media
Visitor List



Organization Charts

The Employer
The Consultant
The Contractors
Others



Consultant Office

List of Staff
Members Only



Project Information
Introduction
(MS-PowerPoint)
Project Map
Background
Major Features
Chronicle
Contract Packages
Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII
Natural Conditions
Socio-Economic Dev.



Public Relations
Site Map
Contact Us
Related Agencies
Link
FAQs
Knowledgebase
Guest Book



Our Gallery
Computer Graphics
Perspective
Vietnam
Introduction
Photo Selection



Around Project
Highway Network in
Vietnam
Large-scaledHighway
Projects in Central
of Vietnam



Tiếng Việt



Coordination