Summary Reviewed the construction based on the work program of civil contractors and electrical contractor Changed the design of the site office and warehouse in light of the location of the power transmission lline of 35kV Submitted the specification and shop drawings for fans for approval Studied the layout of cable ducts and water pipes in the cable trough laid underground the portal of EP tunnels and ventilaton adit Submitted the proposal for change of water catchment source Studied proposal for modification of the existing water supply & water treatment system Studied the modification of ventilation facilitiesPrevious