As of March 31 , 2005

Physical Progress

Contractor

Matsushita - Itochu Consortium

Commencement of the Works

13 March 2002

Contract period 1080 days (Until March 12, 2005)
Time Elapsed (days) 1066 of 1080 (98.70%) Remaining 14 days

Progress

 
  Continue the work for the Water Supply & Treatment System, Ventilation Adit Building, and Tunnel Ventilation System.

Photographs

Auxiliary machines at EP1 (29 Mar)
Checking auxiliary machine local operation panel
at EP1 (29 Mar)
Duct & nozzle at EP2 (18 Mar)
Hanging duct & nozzle at EP2 (18 Mar)
VAB Installing parapet (7 Mar)
VAB Painting work (7 Mar)
Installing 10t overhead traveling crane in VAB (8 Mar)
Adjusting 5t overhead traveling crane in VAB (30 Mar)
Foundation for supply/exhaust fans (23 Mar)
Delivery for components of supply fans (23 Mar)
Lower parts of casing for supply fans (29 Mar)
Installing blades for supply fan No.2 (30 Mar)
Lower parts of casing for supply fans (29 Mar)
Jet fan operation test for No.1 & 2 (17 Mar)
Appearance test for Jet fan No.8 (28 Mar)
Concrete structuring for HLR (23 Mar)
Drill shaft hut (29 Mar)
Water & air piping at EP1 (29 Mar)
Air & water piping at auxiliary machine room
EP1 (29 Mar)

Top

Construction Supervision

Summary

Water Supply and Treatment System:

- High Level Reservoir reached 53%

- Water Treatment System at OCC reached 99%

- Water piping and Hydranr reached 94%

Ventilation Adit Building:

- Construction of building reached 96%

- Ventilation Adit Connection reached 78%

Tunnel Ventilation System:

- EP System reached 98% for EP1, 96% for EP2, 97% for EP3

- Jet Fan System reached 99%

- Air Supply/Exhaust Ventilation System reached 75%

- Ventilation Control System reached 72%

Construction Supervision

Top

Previous month/Next month

This homepage is presented by the Consultant Team

Any further question should be forwarded to Webmaster or Consultant Team

 

 


Progress To Date

By Figure
By Primavera



Tunnel Excavation
Record

By Number
By Figure
By Plan
By Chart




Monthly Progress

Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII



News and Events
Project
Public Media
Visitor List



Organization Charts

The Employer
The Consultant
The Contractors
Others



Consultant Office

List of Staff
Members Only



Project Information
Introduction
(MS-PowerPoint)
Project Map
Background
Major Features
Chronicle
Contract Packages
Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII
Natural Conditions
Socio-Economic Dev.



Public Relations
Site Map
Contact Us
Related Agencies
Link
FAQs
Knowledgebase
Guest Book



Our Gallery
Computer Graphics
Perspective
Vietnam
Introduction
Photo Selection



Around Project
Highway Network in
Vietnam
Large-scaledHighway
Projects in Central
of Vietnam



Tiếng Việt



Coordination