Progress Report > Package IB - South Tunnel Section
Summary from Contractor Main Tunnel and Evacuation Tunnel excavation was completely finished. Bench excavation and tunnel lining were completed. The rear concrete works is ongoing. Construction Supervision by Engineer Cut
and Cover Section Construction of asphalt concrete (6cm) 11000m2 Main
Tunnel Rear Work Finished Road
work Profile line marking at roadway was completed 2423m Rubber guard cone was completed 95 pieces Stainless steel revision shaft cover was completed 96 pieces Evacuation
Tunnel Rear Work Construction of penetration layer was completed 875m Construction of concrete pavement was completed 60m Major Events and Issues This homepage is presented by the Consultant Team Any further question should be forwarded to Webmaster or Consultant Team
|
|
||||||||||||||||||||||