As of December 31, 2004

Physical Progress

Contractor

Matsushita - Itochu Consortium

Commencement of the Works

13 March 2002

Contract period 1080 days (Until March 12, 2005)
Time Elapsed (days) 1008 of 1080 (93.33%) Remaining 62 days

Progress

 
  Continue the work for the Water Supply & Treatment System, Ventilation Adit Building, and Tunnel Ventilation System.

Photographs

Installation of hydrant at layby right
Installation of auxiliary machines at EP1
Concrete Placing for entrance wall at EP3
Installation of roof top tank at OCC
Turning over inspection for water supply pipes at OCC
Manufacturing separation wall for VAC in factory
Foundation beam for airduct of VAB
Installation air conditioner

Top

Construction Supervision

Summary

Water Supply and Treatment System:

-          High Level Reservoir reached 15%

-          Water Treatment System at OCC reached 50%

-          Water piping and Hydranr reached 69%

Ventilation Adit Building:

-          Construction of building reached 77%

-          Ventilation Adit Connection reached 58%

Tunnel Ventilation System:

-          EP System reached 73%

-          Jet Fan System reached 75%

-          Air Supply/Exhaust Ventilation System reached 35%

-          Ventilation Control System reached 32%

Construction Supervision         

Top

Previous month / Next month

This homepage is presented by the Consultant Team

Any further question should be forwarded to Webmaster or Consultant Team

 

 


Progress To Date

By Figure
By Primavera



Tunnel Excavation
Record

By Number
By Figure
By Plan
By Chart




Monthly Progress

Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII



News and Events
Project
Public Media
Visitor List



Organization Charts

The Employer
The Consultant
The Contractors
Others



Consultant Office

List of Staff
Members Only



Project Information
Introduction
(MS-PowerPoint)
Project Map
Background
Major Features
Chronicle
Contract Packages
Package IA
Package IB
Package IIA
Package IIB
Package III
Package IV
Package V
Package VI
Package VII
Natural Conditions
Socio-Economic Dev.



Public Relations
Site Map
Contact Us
Related Agencies
Link
FAQs
Knowledgebase
Guest Book



Our Gallery
Computer Graphics
Perspective
Vietnam
Introduction
Photo Selection



Around Project
Highway Network in
Vietnam
Large-scaledHighway
Projects in Central
of Vietnam



Tiếng Việt



Coordination