As of November 2003 - Home | Next

Electrostatic Precipitator No.2 Drilling Works for Blasting up to Sta.0+064.7; Rem=13.9m
(Same Time Installation of Convergence Point at Fracture Zone)

Khoan nổ měn tại Hầm lọc bụi tĩnh điện số 2

Tháng 11/2003 - Trở về