Walkway Wall Completed Concrete Including Layby No.2 fr. Sta. 1+669.70 ~ 2+481.2 (L=811.5)

Đổ bê tông tường đường đi bộ đến Layby No.2 từ Sta. 1+669.70 ~ 2+481.2 (L=811.5)