Center Drainage Concrete Pipe D400mm Setting at Main Tunnel up to Sta. 2+170; Lt+460.0m

Đặt ống bê tông D400mm cho hệ thống thoát nước giữa đến Sta. 2+170, dài  460.0m

Tháng 08/2003 - Trở về